SETUP

CONDITIONS REQUIRING DISASSEMBLY
You may need to open up the meter for one of the following reasons:
1. To check or change the 115 or 230 V ac power jumpers.
2. To install or remove jumpers on the main board.

DISASSEMBLY
Removing and accessing the main meter board:
1. Make sure that main power has been removed from the meter
2. Remove the rear case cover.
3. Lift the rear of the main board upwards and slide out of the case.

RATING/PRODUCT LABEL
This label is located on top of the meter housing.

MAIN BOARD POWER JUMPERS

To check voltage jumpers, or to change from 115 V to 230 V ac:
1. Remove the main board from the case. Refer to Section 6.2.

2.
Locate the solder jumpers W1, W2, and W3 (located near the edge of the main board alongside the transformer - refer to Figure 6-1).

3.
If your power requirement is 115 V ac, solder jumpers W1 and W3 should be wired, but jumper W2 should not. If your power requirement is 230 V ac, solder jumper W2 should be wired, but jumpers W1 and W3 should not.
NOTE: W4 jumper is not used.
Figure 6-1 shows the W1 through W3 jumpers on the main board.

Main Board Jumpers

Figure 6-2 shows the main board jumpers.
Figure 6-2 shows the main board jumpers.
DISPLAY BOARD

Main Board Jumper Positions
Figure 6-2
Main Board Jumper Positions (6 S2 Pins)

S2 jumpers are for sensor break indications:
* S2A jumper is not used
* S2B jumper is for positive sensor break (i.e. heating)
* S2C & S2D are not used

S3 jumpers are used for the following (refer to Table 6-1):
* To enable or disable the front panel push-buttons
* To allow for an extremely low resistance load for analog output
* To disable the MENU button
* To perform calibration procedure

Test pins TP1 - TP11 are for testing purposes. Do not use as reading errors may result.


S3 Jumper Functions Table 6-1
JUMPER
DESCRIPTION
S3-A
Install to enable front panel push-buttons. Remove to disable all front panel push-buttons
S3-B
Removed. Install for meter calibration.
S3-C
Normally removed. Install for analog voltage output when load has less than 1 Kohm impedance. Care should be taken when installing this jumper.
S3-D
Removed. Not used.
S3-E
If installed without S3-B, the MENU button locks out.
PANEL MOUNTING



1.
Cut a hole in your panel, as shown in Figure 3-4.

2. Insert the meter into the hole. Be sure the front bezel is flush to the panel when tightening mounting brackets.

3. Proceed to Section 3.4 to connect your sensor input and main power.
Meter - Exploded View
Figure 3-4. Meter - Exploded View
Help Price List Specifications Print Manual Manuals Home
 Home Home
 Table of Contents TOC  Back Back  Next Next